• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Stow LMHC
Stow LMHC-cont. - TM-9-2320-365-10_293

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  249    250    251    252    253  254  255    256    257    258    259  
TM 9-2320-365-10 2-24.   LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) NOTE Perform steps (6) through (9) if boom was extended. (6)   Remove quick release pin (4) from boom (1). (7)   Push in end of boom extension (5) so that boom (1) is fully retracted. (8)   Align holes (5) in boom (1). (9)   Install quick release pin (4) in boom (1). 2-200







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.