• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Soft Top (Steel Bows) Installation-cont. - TM-9-2320-365-10_324
Soft Top (Steel Bows) Installation-cont. - TM-9-2320-365-10_326

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  281    282    283    284    285  286  287    288    289    290    291  
TM 9-2320-365-10 NOTE Left and right sides of front, center, and rear bows are secured the same way.   Rear bow left side shown. (41)   Position tiedown strap (14) on J-hook (27) with tri-ring (15). (42)   Tighten tiedown strap (14). (43)   Perform steps (41) and (42) on remaining tiedown straps. (44)   Open door (28) on tool box (29). (45)   Remove three cargo cover tiedowns (30) from tool box (29). (46)   Stow stowage strap (8) in tool box (29). (47)   Close door (28) on tool box (29). Change 1 2-229







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.