TM 9-2320-365-103-10. M1081 AIR DROP PREPARATION (CONT)(4) Position turret (7) on mast (5).(5) Install quick release pin (8) in turret (7).WARNINGLight Material HandlingCrane (LMHC) boom andw i n c h w e i g h sapproximately 110 lbs (50kgs). The aid of anassistant is required toinstall LMHC boom andwinch. Fai-lure to complymay result in injury topersonnel or damage toequipment.(6) Position LMHC boom (9) on turret (7).(7) Install quick release pins (10 and 11) in turret (7).(8) Set LMHC boom (9) to 25-degrees(para 2-24f).(9) Extend LMHC boom (9) fully (para 2-24g).(10) Connect remote control and powercable connectors (para 2-24d).(11) Raise cab (para 2-22a).(12) Release latch (12) on ratchet (13).(13) Lift ratchet (13) and release strap (14).(14) Remove strap (14) from ratchet (13).3-110.2 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business