Change 1 2-165TM 9-2320-365-34-1CONTINUITY TEST(10) Connect negative (-) probe of multimeterto ground and note reading on multimeter.(11) If continuity is present, transmission internal wiring harness is shorted; replace transmission internal wiring harness (para 7-13).(1) Remove control valve module (para 7-10).(2) Remove four screws and cover from control valve module.(3) Remove internal wiring harness connector C3 from C3 pressure switch connector.(4) Set multimeter to ohms.(5) Connect positive (+) probe of multimeterto internal wiring harness 24-pinconnector pin F2.(6) Connect negative (-) probe of multimeterto internal wiring harness connector C3 pin A and note reading on multimeter.(7) If continuity is not present, replacetransmission internal wiring harness(para 7-13).(8) Connect positive (+) probe of multimeterto internal wiring harness 24-pinconnector pin F2.(9) Connect negative (-) probe of multimeterto all other pins in internal wiring harness24-pin connector and note reading on multimeter.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business