TM 9-2320-365-34-2
b. Follow-On Maintenance.
(1) Install fuel shutoff solenoid (para 6-4).
(2) Perform fuel timing check (para 4-5).
(3) Perform valve clearance check for rocker arms removed
(3-14).
(4) Install valve cover (TM 9-2320-365-20-2).
(5) Lower cab (TM 9-2320-365-10).
(6) Start engine (TM 9-2320-365-10).
(7) Operate vehicle and check for proper engine operation
(TM 9-2320-365-10).
(8) Shut down engine (TM 9-2320-365-10).
End of Task.
4-11