• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Follow-On Maintenance - TM-9-2320-365-34-2_198
Fuel Timing Checks - TM-9-2320-365-34-2_200

/.5tonv1-2/TM-9-2320-365-34-2 M10787 Series 2-1/2-Ton 4x4 Light Medium Tactical Vehicle (LMTV) Manual
Page Navigation
  154    155    156    157    158  159  160    161    162    163    164  
TM 9-2320-365-34-2 4-5.   FUEL TIMING CHECKS This task covers: a. Fuel Timing Checks b.   Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-365-10). Valve cover removed (TM 9-2320-365-20-2). Fuel setting check completed (para 4-4). Tools and Special Tools Tool Kit, Genl Mech (Item 68, Appendix B) Tools and Special Tools (Cont) Tool Kit, Intl. Comb. Eng. (TM 9-2320-365-20) Wrench, Torque, 0-60 N·m (Item 84, Appendix B) Wrench Set, Socket (Item 75, Appendix B) Personnel Required (2) a.   Fuel Timing Checks. CAUTION Crankshaft must always be rotated to right to align  timing  bolt  with  flywheel.     Failure  to comply may result in damage to equipment. NOTE Use   bolt   on   front   of   alternator   to   rotate crankshaft for timing bolt installation. (1)  Rotate crankshaft to the right two complete revolutions. (2)  Remove  plug  (1)  from  timing  hole  on  front  of  flywheel housing (2). NOTE •  Steps  (3)  through  (8)  requires  the  aid  of  an assistant. •  Mark damper to engine front cover when timing bolt engages with flywheel. (3)  Install timing bolt (3) in timing hole on front of flywheel housing (2). 4-18







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.