• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Follow-On Maintenance - TM-9-2320-365-34-2_578
M1078/M1079 Removal

/.5tonv1-2/TM-9-2320-365-34-2 M10787 Series 2-1/2-Ton 4x4 Light Medium Tactical Vehicle (LMTV) Manual
Page Navigation
  522    523    524    525    526  527  528    529    530    531    532  
TM 9-2320-365-34-2 13-12.   FRONT LIFTING BRACKET REPLACEMENT This task covers: a. M1078/M1079 Removal b. M1078/M0179 Installation c.  M1081 Removal d.   M1081 Installation e.   Follow-On Maintenance INITIAL SETUP Equipment Conditions Intake air cleaner removed (TM 9-2320-365-20-3). Spare tire retainer removed (TM 9-2320-365-20-3). Radiator overflow tank removed (TM 9-2320-365-20- 3). Hydraulic reservoir removed, if equipped (TM 9-2320- 365-20-4). Fuel tank removed (TM 9-2320-365-20-3). Engine oil fill tube removed (TM 9-2320-365-20-2). Transmission oil fill tube removed (M1078/M1079) (TM 9-2320-365-20-3). Tools and Special Tools Tool Kit, Genl Mech (Item 68, Appendix B) Goggles, Industrial (Item 25, Appendix B) Wrench, Torque 0-600 lb-ft (Item 85, Appendix B) Wrench Set, Socket (Item 74, Appendix B) Sling, Cargo (2) (Item 48, Appendix B) Socket Set, Impact (Item 50, Appendix B) Tools and Special Tools (Cont) Wrench, Torque, 0-175 lb-ft (Item 80, Appendix B) Wrench, Impact, Electric (Item 77, Appendix B) Materials/Parts Nut, Self-locking (4) (Item 135, Appendix F) Nut, Self-locking (16) (Item 134, Appendix F) (M1078/M1079) Nut, Self-locking (20) (Item 134, Appendix F) (M1081) Bolt (16) (Item 12, Appendix F) (M1078/M1079) Bolt (20) (Item 12, Appendix F) (M1081) Washer, Spring Tension (8) (Item 304, Appendix F) Personnel Required (3) a.   M1078/M1079 Removal. WARNING Lifting beam weighs approximately 75 lbs (34 kgs).  Attach a suitable lifting device prior to removal.     Failure  to  comply  may  result  in injury to personnel or damage to equipment. NOTE •  Left and right side lifting beams are removed the same way.   Right side shown. •  Step (3) requires the aid of an assistant. (1)  Remove two pins (1) and lifting beam (2) from front lifting bracket (3). (2)  Perform step (1) on left side lifting beam. 13-42 Change 1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.