TM 9-2320-365-10Table 2-1. Preventive Maintenance Checks and Services (All Models) (Cont)LocationItemNo.IntervalItem toCheck/ServiceCrewmemberProcedureNot FullyMission CapableIf:WARNINGWear heavy leather-palmed work gloves when handling cable.Cables can become frayed or contain broken wires. Never letmoving cable slide through hands, even when wearing gloves.Failure to comply may result in serious injury or death topersonnel.44Weekly11K SRWOperation (IfEquipped)a. Check 11K SRW forproper operation inboth directions (para2-54).b. Check cable for kinks,frays, and breaks.c. Check cable end formissing or damagedpin or cotter pin.2-66
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business