TM 9-2320-365-102-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION(CONT)j. Raise and Lower Load.CAUTION• Do not lift load over maximum load rating for Light Material Handling Crane(LMHC). Failure to comply may result in damage to equipment.• Use only a straight pull when lifting load. Failure to comply may result in damageto equipment.• After performing eight cycles with LMHC, allow 30 minutes to cool down. A cycleis defined as pickup, move, and place a load. A cycle may be from cargo bed ofvehicle to ground or ground to cargo bed of vehicle. Failure to comply may resultin damage to equipment.NOTESteps (1) through (7) require the aid of an assistant.(1) Adjust boom (1) until end of boom is over load (para 2-24g).(2) Place hoist control switch (2) in up position to pay out cable (3).(3) Connect hook (4) to load.2-196
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business