Change 1 2-955TM 9-2320-365-34-1CONTINUITY TEST(1) Set multimeter to ohms.(2) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C3. (3) Connect negative (-) probe of multimeterto internal wiring harness connector C3pin B and note reading on multimeter.(4) If continuity is not present, replacetransmission internal wiring harness(para 7-13).(5) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C3.(6) Connect negative (-) probe of multimeterto all other pins in internal wiring harness24-pin connector and note reading onmultimeter.(7) Connect negative (-) probe of multimeterto ground and note reading on multimeter.(8) If continuity is present, transmissioninternal wiring harness is shorted; replacetransmission internal wiring harness(para 7-13).(9) Connect internal wiring harness connectorC3 to C3 pressure switch.(10) Install cover on control valve module withfour screws.(11) Install control valve module (para 7-10).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business