Change 1 2-167TM 9-2320-365-34-1CONTINUITY TEST(1) Set multimeter to ohms.(2) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C3.(3) Connect negative (-) probe of multimeterto internal wiring harness connector C3 pin B.(4) If continuity is not present, replace transmission internal wiring harness (para 7-13).(5) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C3.(6) Connect negative (-) probe of multimeterto all other pins in internal wiring harness24-pin connector and note reading on multimeter.(7) Connect negative (-) probe of multimeterto ground and note reading on multimeter.(8) If continuity is present, transmissioninternal wiring harness is shorted; replacetransmission internal wiring harness(para 7-13).(9) If continuity is present in step (3) andabsent in steps (6) and (7), replace C3pressure switch (para 7-8).(10) Connect internal wiring harness connector C3 to C3 pressure switch connector.(11) Install cover on control valve module with four screws.(12) Install control valve module (para 7-10).(13) Connect batteries (TM 9-2320-365-20-3).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business