TM 9-2320-365-10 2-27.   CARGO COVER KIT INSTALLATION/REMOVAL a.   Soft Top Kit (Steel Bows) Installation. (1)   Lower ladder (para 2-26a). (2)   Open stowage compartment door (1). NOTE Soft  top  kit  is  equipped  with  a  total  of  10  tubes.    Five  front  tubes  are longer than rear tubes. (3)   Stow five front tubes (2) and steel pole (3) in stowage compartment. (4)   Close stowage compartment door (1). NOTE Front, center, and rear bows have two bow straps and tiedown straps. All  tiedown  straps  are  installed  on  bow  straps  the  same  way.    One tiedown strap shown. (5)   Install tiedown strap (4) through buckle of bow strap (5). (6)   Perform step (5) on remaining tiedown straps. Change 1 2-215







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.