• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Soft Top Kit (Steel Bows) Installation-cont. - TM-9-2320-365-10_312
Soft Top Kit (Steel Bows) Installation-cont. - TM-9-2320-365-10_314

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  269    270    271    272    273  274  275    276    277    278    279  
TM 9-2320-365-10 NOTE Left and right sides of front, center, and rear bows are secured the same way.   Right side shown. (10)   Position three tiedown straps (4) on J-hook (14) with three tri-rings (15). (11)   Tighten three tiedown straps (4). (12)   Perform steps (10) and (11) on left side. (13)   Install stowage strap (16) on front bow (6), center bow (9), and rear bow (11). Change 1 2-217







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.