TM 9-2320-365-103-11. M1081 AIR DROP RECOVERY OPERATIONSThis task covers:a. Cab Recoveryb. Spare Tire Recovery (VehiclesEquipped with Machine Gun Ring).c. Spare Tire Recovery (Vehicles NotEquipped with Machine Gun Ring).d. Slide Assembly Recoverye. Load Spreader Recoveryf. Follow-On MaintenanceINITIAL SETUPEquipment ConditionsVehicle parked on level ground.Engine shut down (para 2-21f).Wheels chocked (para 2-21h).Tools and Special ToolsWrench Assembly, Speedhandle(Item 6 (COEI), Appendix B)Wrench, Adjustable, 8 in. (Item 16,Appendix B)Strap Assembly (Item 5 (COEI),Appendix B)Sling Assembly, Air Drop Roof (Item4 (COEI), Appendix B)Tools and Special Tools (Cont)Crane, Light Material Handling, Kit1500 lb Capacity (Appendix C)(Vehicles equipped with machine gunring)Crane Adapter Kit (Appendix C)(Vehicles equipped with machine gunring)ReferencesFM 10-526Personnel Required(3)a. Cab Recovery.WARNINGVehicle must not beoperated until rear paneland side panels are raisedand properly secured.Failure to comply mayresult in serious injury ordeath to personnel ordamage to equipment.NOTESteps (1) through (56) requirethe aid of an assistant.(1) Raise rear panel (1) and fasten five panel latches (2).3-126 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business