• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Follow-On Maintenance
Counterbalance Valve Removal

/.5tonv1-2/TM-9-2320-365-34-2 M10787 Series 2-1/2-Ton 4x4 Light Medium Tactical Vehicle (LMTV) Manual
Page Navigation
  774    775    776    777    778  779  780    781    782    783    784  
TM 9-2320-365-34-2 16-3.   11K SELF-RECOVERY WINCH (SRW) CARTRIDGE/COUNTERBALANCE VALVE REPLACEMENT This task covers: a. Cartridge Valve Removal b. Cartridge Valve Installation c.  Counterbalance Valve Removal d.   Counterbalance Valve Installation e.   Follow-On Maintenance INITIAL SETUP Equipment Conditions 11K Self-recovery winch (SRW) cable removed (TM 9-2320-365-20-4). Tools and Special Tools Tool Kit, Genl Mech (Item 68, Appendix B) Wrench, Torque, 0-300 lb-in. (Item 83, Appendix B) Wrench, Torque, 0-175 lb-ft (Item 80, Appendix   B) Pan, Drain (Item 36, Appendix B) Materials/Parts Cap and Plug Set (Item 18, Appendix C) Kit, Seal (Item 86, Appendix F) Packing, Preformed (Item 156, Appendix F) Packing, Preformed (2) (Item 157, Appendix F) Dispenser, Pressure Sensitive Adhesive Tape (Item 31, Appendix C) Packing, Preformed (2) (Item 203.1, Appendix F) Personnel Required (2) a.   Cartridge Valve Removal. (1)  Remove  cartridge  valve  (1)  from  counterbalance  valve (2). (2)  Remove three preformed packings (3) and back-up rings (4) from cartridge valve (1).  Discard preformed packings and back-up rings. b.   Cartridge Valve Installation. (1)  Install  three  back-up rings  (1) and  preformed packings (2) on cartridge valve (3). (2)  Position cartridge valve (3) in counterbalance valve (4). (3)  Tighten cartridge valve (3) to 40-45 lb-ft (54-61 N·m). Change 1 16-19







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.