TM 9-2320-365-103-11. M1081 AIR DROP RECOVERY OPERATIONS (CONT)e. Load Spreader Recovery.NOTE• Left and right side loadspreaders are installedthe same way. Right sideshown.• Steps (1) through (5)require the aid of anassistant.(1) Remove pin (1) and shackle (2) fromfront load spreader (3).(2) Remove two safety pins (4), two pins(5), and front load spreader (3) fromfront bumper (6).(3) Install shackle (2) and pin (1) on frontbumper (6).(4) Position front load spreader (3) and twopins (5) on stowage location on vehicle.(5) Install two safety pins (7) on two pins(5).f. Follow-On Maintenance.(1) Install side panels (para 2-26e).(2) Remove wheel chocks (para 2-21h).(3) Notify Unit Maintenance to torque airintake adapter clamp in accordancewith maintenance paragraph.(4) Notify Unit Maintenance to tightennuts on mirror to 21-27 lb-ft (29-37N·m).End of Task.3-146 Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business