TM 9-2320-365-34-2
21-5. CONVERTER HOUSING MODULE REPAIR
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Transmission disassembled (para 21-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Puller Set, Universal (Item 44, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 80, Appendix B)
Caliper, Vernier (Item 8, Appendix B)
Goggles, Industrial (Item 25, Appendix B)
Gloves, Rubber (Item 23, Appendix B)
Bushing Driver Set (TM 9-2320-365-20)
Inserter, Bearing and Bushing (TM 9-2320-365-20)
Handle, Drive (TM 9-2320-365-20)
Tools and Special Tools (Cont)
Press, Arbor, Hand Operated (Item 41, Appendix
B)
Pliers, Retaining Ring (Item 37, Appendix B)
Materials/Parts
Rag, Wiping (Item 59, Appendix C)
Seal, Plain Encased (Item 264, Appendix F)
Sealring (Item 277, Appendix F)
Packing, Preformed (Item 177, Appendix F)
Gasket (2) (Item 31, Appendix F)
Solvent, Dry Cleaning (Item 81, Appendix C)
a. Disassembly.
(1) Remove 10 bolts (1) from bearing retainer (2).
(2) Position two bolts (1) in threaded holes of bearing
retainer (2).
CAUTION
Tighten bolts evenly to remove bearing
retainer.
Failure to comply may result in
damage to equipment.
(3) Tighten two bolts (1) on bearing retainer (2).
(4) Remove bearing retainer (2) from converter housing (3).
(5) Remove two bolts (1) from bearing retainer (2).
(6) Remove seal (4) from bearing retainer (2). Discard seal.
(7) Remove sealring (5) from bearing retainer (2). Discard
sealring.
21-30