TM 9-2320-365-34-2
7-11. CONTROL VALVE MODULE REPAIR
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Transmission internal wiring harness removed (para
7-13).
Tools/Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Wrench, Torque, 0-150 lb-in. (Item 79, Appendix B)
Goggles, Industrial (Item 25, Appendix B)
Wrench Set, Socket (Item 75, Appendix B)
Tools and Special Tools (Cont)
Gloves, Rubber (Item 23, Appendix B)
Materials/Parts
Solvent, Dry Cleaning (Item 81, Appendix C)
Rag, Wiping (Item 59, Appendix C)
Honing Stone Assembly (Item 40, Appendix C)
Cloth, Abrasive (Item 23, Appendix C)
Gasket (Item 36, Appendix F)
a. Disassembly.
(1) Remove two bolts (1) and turbine speed sensor (2)
from main valve body (3).
(2) Remove eight bolts (4) and stationary clutch valve
body (5) from main valve body (3).
(3) Remove three bolts (6) and rotating clutch valve body
(7) from main valve body (3).
(4) Remove five bolts (8) and C6 clutch valve body (9)
from channel plate (10).
7-77