TM 9-2320-365-34-2
13-13. FRAME RAIL REPLACEMENT (CONT)
(3) Install engine and transmission oil sampling valves (TM
9-2320-365-20-2).
(4) Install radiator brackets (para 13-19).
(5) Install air cleaner (TM 9-2320-365-20-3).
(6) Install spare tire retainer (TM 9-2320-365-20-3).
(7) Install radiator overflow tank (TM 9-2320-365-20-3).
(8) Install frame muffler support bracket (para 13-18).
(9) Install rear cab support assembly (TM 9-2320-365-20-4).
(10) Install 11K Self-Recovery Winch (SRW) control valve
assembly and brackets, if equipped (TM 9-2320-365-20-
4).
(11) Install steering gear (para 12-2).
(12) Install power steering hoses and tubes (TM 9-2320-365-
20-3).
(13) Install Central Tire Inflation System (CTIS) hoses and
fittings (TM 9-2320-365-20-3).
(14) Install 11K Self-Recovery Winch (SRW) hoses, if
equipped (TM 9-2320-365-20-4).
(15) Install deep water fording kit, if equipped (TM 9-2320-
365-20-5).
(16) Install power steering pump reservoir and bracket (TM 9-
2320-365-20-3).
(17) Install 11K Self-Recovery Winch (SRW) rear cable
pulleys, if equipped (TM 9-2320-365-20-4).
(18) Install M1081 angle brackets (para 13-10).
(19) Install alternator ground strap (TM 9-2320-365-20-3).
(20) Install suspension cylinder (para 17-2).
(21) Install air spring and bracket (TM 9-2320-365-20-4).
(22) Install radiator/charge air cooler (TM 9-2320-365-20-3).
(23) Install engine front resilient mount and mounting bracket (para 3-4).
13-70
Change 1
