TM 9-2320-365-34-2
13-20. M1079 SUBFRAME RAIL REPLACEMENT (CONT)
NOTE
Steps (2) through (9) require the aid of an
assistant.
(2) Position four bolts (2) in bracket (3) with four self-locking
nuts (4).
(3) Tighten four self-locking nuts (4) to 210-225 lb-ft (285-
305 N·m).
(4) Position six bolts (5) in brackets (6 and 7) with six self-
locking nuts (8).
(5) Tighten six self-locking nuts (8) to 210-225 lb-ft (285-305
N·m).
(6) Position two bolts (9) in bracket (10) with two self-locking
nuts (11).
(7) Tighten two self-locking nuts (11) to 210-225 lb-ft (285-
305 N·m).
13-94
Change 1