TM 9-2320-365-34-2(6) Install leaf spring (1) in rear bracket (10) with spring pin(11).(7) Install lubrication fitting (12) in spring pin (11).(8) Position screw (13) and nut (14) in rear bracket (10).(9) Tighten nut (14) to 76-94 lb-ft (103-127 N·m).(10) Place floor jack under rear axle (2).(11) Raise rear axle (2) until leaf spring (1) is in mountingposition.(12) Install plate (15) on leaf spring (1).(13) Install two U-bolts (16) on leaf spring (1) with fourwashers (17) and nuts (18).(14) Tighten four nuts (18) to 390-510 lb-ft (529-692 N·m).(15) Remove floor jack from rear axle (2).c. Follow-On Maintenance.(1) Install rear wheels (TM 9-2320-365-10).(2) After 1000 miles of vehicle operation, torque four nuts onU-bolts in increments of 50 lb-ft (68 N·m) to 390-510 lb-ft(529-692 N·m) in crisscross pattern.End of Task.Change 1 14-19
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business