TM 9-2320-365-34-215-8. CARGO BED REPLACEMENT (CONT)(8) Position mudflap (10) on bumper (11) with three screws(12), spacers (13), washers (14), and nuts (15).(9) Tighten three nuts (15) to 18-22 lb-ft (24-30 N·m).(10) Perform steps (5) through (8) on left side fender andmudflap.c. M1081 Removal.NOTELeft and right fenders and mudflaps areremoved the same way. Right side shown.(1) Remove three nuts (1), washers (2), spacer (3), screw(4), and mudflap (5) from bumper (6).(2) Remove two nuts (7), four washers (8), two screws (9),and fender (10) from bracket (11).(3) Perform steps (1) and (2) on left side fender andmudflap.15-124
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business