TM 9-2320-365-34-2(3) Remove fitting (3) and 90 degree fitting (4) fromhydraulic rotary pump (8).(4) Remove preformed packings (9 and 10) from fitting (3)and 90 degree fitting (4).b. Installation.(1) Install preformed packings (1 and 2) on fittings (3) and90 degree fitting (4).(2) Install fitting (3) and 90 degree fitting (4) in hydraulicrotary pump (5).NOTEStep (3) requires the aid of an assistant.(3) Position hydraulic rotary pump (5) on PTO (6) with twowashers (7) and screws (8).(4) Tighten two screws (8) to 58-78 lb-ft (79-105 N m).(5) Connect hydraulic hoses (9 and 10) to fitting (3) and 90degree fitting (4).16-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business