• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Prepare LMHC for Use-cont. - TM-9-2320-365-10_279
Prepare LMHC for Use-cont. - TM-9-2320-365-10_281

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  237    238    239    240    241  242  243    244    245    246    247  
TM 9-2320-365-10 2-24.   LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) WARNING Ensure that engine is shut down before connecting power cable at vehicle NATO connector.  Failure to comply may result in serious injury or death to personnel. CAUTION Ensure that power cable does not come in contact with hot exhaust pipe. Failure to comply may result in damage to equipment. (8)   Remove dust cap (10) from power cable connector (11). (9)   Remove dust cap (12) from circuit breaker box connector (13). (10)   Connect power cable connector (11) to circuit breaker box connector (13). (11)   Remove dust cap (14) from circuit breaker box NATO connector (15). (12)   Remove dust cap (16) from vehicle NATO connector (17). (13)   Connect circuit breaker box NATO connector (15) to vehicle NATO connector (17). 2-188







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.