• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Prepare LMHC for Use-cont. - TM-9-2320-365-10_281
Raise Boom

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  239    240    241    242    243  244  245    246    247    248    249  
TM 9-2320-365-10 2-24.   LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) e.   Installing Long handle (if required). NOTE The long handle may be installed and used to rotate crane.   To remove short handle and install long handle perform steps (1) and (2). (1)   Remove two nuts (1), lockwashers (2), washers (3), screws (4) and short handle (5) from ratchet (6). (2)   Install long handle (7) in ratchet (6) with two washers (3), screws (4), lockwashers (2) and nuts (1). (3)   Notify Unit Maintenance to replace lockwashers. 2-190







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.