• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Raise Boom
Telescope Boom

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  241    242    243    244    245  246  247    248    249    250    251  
TM 9-2320-365-10 2-24.   LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION (CONT) NOTE Perform steps (6) through (8) to raise boom to 25-degree or 57-degree position. (6)   Remove quick release pin (4) from turret (3). (7)   Raise boom (1) to desired position. (8)   Install quick release pin (4) in turret (3). 2-192 Change 1







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.