TM 9-2320-365-102-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION(CONT)(14) Adjust boom (1) so that end of boom is in line with cargo bed tiedown ring (7).(15) Place hoist control switch (8) in up position to pay out cable (9).2-202
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business