• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
M1079 VAN FAN OPERATION
M1079 VAN FIELD PHONE BINDING POST OPERATION

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  343    344    345    346    347  348  349    350    351    352    353  
TM 9-2320-365-10 2-35.   M1079 VAN FAN OPERATION (CONT) b.  Turning Fan Off. (1)   Position FAN switch (4) to OFF. (2)   Unlock bottom stud fastener (3). (3)   Close fan cover (2) and position on top stud fastener (1). (4)   Lock top stud fastener (1). 2-36.   M1079 VAN 24 VDC BINDING POST OPERATION a.   Connecting 24 vdc Binding Posts. (1)   Connect positive wire to 24 vdc POS binding post (1). (2)   Connect negative wire to 24 vdc NEG binding post (2). (3)   Connect ground wire to 24 vdc GND binding post (3). 2-272







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.