TM 9-2320-365-102-39. M1079 VAN AIR CONDITIONER/HEATER OPERATIONb. Heater Operation.(1) Open cover (1) on 110/208 VAC POWER DISTRIBUTION PANEL (2).(2) Position main power switch to ON.(3) Refer to TM 5-4520-253-13, Operator’s, Unit, and Intermediate Maintenance Manual.2-40. AUXILIARY EQUIPMENT OPERATIONa. Stow Rifle in Mount.(1) Turn handle (1) up.(2) Position rifle (2) in support (3).2-276
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business