M1079 VAN 12/24 VDC POWER CONNECTION/DISCONNECTION
AUXILIARY EQUIPMENT OPERATION

/.5tonv1-2/TM-9-2320-365-10 Palletized Load System Model M1074/M1075 NSN 2320-01-304-2277 2320-01-304-2278 Manual
Page Navigation
  346    347    348    349    350  351  352    353    354    355    356  
TM 9-2320-365-10 b.   Disconnecting 12/24 vdc Power. (1)   Disconnect 12/24 vdc power cable (3) from 12/24 vdc power receptacle (2). (2)   Install dust cap (1) on 12/24 vdc power receptacle (2). 2-39.   M1079 VAN AIR CONDITIONER/HEATER OPERATION a.   Air Conditioner Operation. (1)   Open cover (1) on 110/208 VAC POWER DISTRIBUTION PANEL (2). (2)   Position main power switch to ON. (3)   Refer to TM 5-4120-384-14, Operator’s Organizational, Direct Support and General Support Maintenance Manual. 2-275