• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
 Follow-On Maintenance. - TM-9-2320-365-34-2_391
Disassembly - TM-9-2320-365-34-2_393

/.5tonv1-2/TM-9-2320-365-34-2 M10787 Series 2-1/2-Ton 4x4 Light Medium Tactical Vehicle (LMTV) Manual
Page Navigation
  343    344    345    346    347  348  349    350    351    352    353  
TM 9-2320-365-34-2 7-11.   CONTROL VALVE MODULE REPAIR This task covers: a. Disassembly b. Cleaning/Inspection c.    Assembly d.   Follow-On Maintenance INITIAL SETUP Equipment Condition Transmission internal wiring harness removed (para 7-13). Tools/Special Tools Tool Kit, Genl Mech (Item 68, Appendix B) Wrench, Torque, 0-150 lb-in. (Item 79, Appendix B) Goggles, Industrial (Item 25, Appendix B) Wrench Set, Socket (Item 75, Appendix B) Tools and Special Tools (Cont) Gloves, Rubber (Item 23, Appendix B) Materials/Parts Solvent, Dry Cleaning (Item 81, Appendix C) Rag, Wiping (Item 59, Appendix C) Honing Stone Assembly (Item 40, Appendix C) Cloth, Abrasive (Item 23, Appendix C) Gasket (Item 36, Appendix F) a.   Disassembly. (1)  Remove two bolts (1) and turbine speed sensor (2) from main valve body (3). (2)  Remove eight bolts (4) and stationary clutch valve body (5) from main valve body (3). (3)  Remove three bolts (6) and rotating clutch valve body (7) from main valve body (3). (4)  Remove five bolts (8) and C6 clutch valve body (9) from channel plate (10). 7-77







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.