TM 9-2320-365-10
2-58. PREPARATION FOR INTERNAL AIR TRANSPORT (CONT)
(8) Remove four cushioning pads (15) from subframe (8) and store in tool box.
(9) Install spring (16), stud (17), and two washers (18) in subframe (8) with two slotted
nuts (19).
(10) Install two lynch pins (20) in stud (17).
(11) Perform steps (9) and (10) on opposite side of subframe (8).
2-362.4
Change 1