Change 1 2-271TM 9-2320-365-34-1CONTINUITY TESTInspect connector pins/sockets for damage,corrosion, and serviceability. Check thatconnector pins are not pushed back andare capable of making good contact.CAUTIONUse care when testing electrical connectors.Do not damage connector pins or socketswith multimeter probes. Failure to complymay result in damage to equipment.NOTE(1) Remove control valve module (para 7-10).(2) Remove four screws and cover fromcontrol valve module.(3) Disconnect internal wiring harnessconnector C from C solenoid connector.(4) Set multimeter to ohms.(5) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C1.(6) Connect negative (-) probe of multimeter tointernal wiring harness connector Csocket A and note reading on multimeter.(7) If continuity is not present, replacetransmission internal wiring harness(para 7-13).(8) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin C1.(9) Connect negative (-) probe of multimeter toall other pins in internal wiring harness24-pin connector and note reading onmultimeter.(10) Connect negative (-) probe of multimeter toground and note reading on multimeter.(11) If continuity is present, transmissioninternal wiring harness is shorted; replacetransmission internal wiring harness(para 7-13).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business