TM 9-2320-365-34-2
3-12. ROCKER ARM AND PUSH ROD REPLACEMENT/REPAIR
This task covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
f. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Valve cover removed (TM 9-2320-365-20-2).
Fuel shutoff solenoid removed (para 6-4).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 80, Appendix
B)
Socket Wrench Attachment, Screwdriver (TM 9-
2320-365-20)
Adapter, Socket Wrench (Item 3, Appendix B)
Tools and Special Tools (Cont)
Goggles, Industrial (Item 25, Appendix B)
Gloves, Rubber (Item 23, Appendix B)
Materials/Parts
Rag, Wiping (Item 59, Appendix C)
Solvent, Dry Cleaning (Item 81, Appendix C)
Lubricating Oil, Engine (Item 45, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape (Item
31, Appendix C)
a. Removal.
NOTE
All six rocker arm groups are removed the same
way. No. 1 rocker arm group shown.
No. 1 cylinder rocker arm group will have a
deflector.
(1) Remove four bolts (1) and deflector (2) from rocker arm
group (3).
CAUTION
Hold rocker arm group level when removing
from
engine
to
prevent
accidental
disassembly. Failure to comply may result in
damage to equipment.
(2) Remove rocker arm group (3) from cylinder head (4).
3-89
