TM 9-2320-365-34-2
9-4. FRONT AXLE DIFFERENTIAL CARRIER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Cab raised (TM 9-2320-365-10).
Tie-rod assembly removed (TM 9-2320-365-20-3).
Front axle shafts removed (para 9-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Goggles, Industrial (Item 25, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 80, Appendix B)
Tools and Special Tools
Lift, Transmission/Differential (Item 32, Appendix
B)
Sling, Cargo (Item 48, Appendix B)
Materials/Parts
Sealant, Adhesive (Item 67, Appendix C)
Screw (4) (Item 251.1, Appendix F)
Personnel Required
(2)
WARNING
Wear appropriate eye protection when
working under vehicle due to the possibility
of falling debris. Failure to comply may
result in injury to personnel.
a. Removal.
(1) Remove four screws (1) and two bearing cups (2) from
drive yoke (3). Discard screws.
(2) Slide drive shaft (4) from side to side and separate
universal joint (5) from drive yoke (3).
Change 1
9-15
