TM 9-2320-365-34-2
9-3. FRONT AXLE SHAFT AND SEALS REPLACEMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Wheel bearing/CTIS seal removed (TM 9-2320-
365-20-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Puller, Mechanical (Item 45, Appendix B)
Goggles, Industrial (Item 25, Appendix B)
Gloves, Rubber (Item 23, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 80, Appendix B)
Respirator, Air Filtering (Item 46, Appendix B)
Driver, Front Axle Shaft Seal (Item 42, Appendix D)
Materials/Parts
Rag, Wiping (Item 59, Appendix C)
Seal, Plain Encased (2) (Item 269, Appendix F)
Dispenser, Pressure Sensitive Adhesive Tape
(Item 31, Appendix C)
Solvent, Dry Cleaning (Item 81, Appendix C)
Grease, Automotive and Artillery (Item 36,
Appendix C)
Personnel Required
(2)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Removal.
NOTE
Tag brake hoses and connection points prior
to disconnecting.
(1) Disconnect two brake hoses (1) from front brake air
chamber (2).
9-11
