TM 9-2320-365-34-2
16-6. POWER TAKEOFF (PTO) REPLACEMENT/REPAIR (CONT)
(14.8) Position transmission oil cooler return tube (18.2) on 90-
degree fitting (18.4).
(14.9) Tighten transmission oil cooler return tube (18.2) to 94-
104 lb-ft (127-141 N·m).
(15) Connect oil hose (19) to 90-degree fitting (4).
(16) Install oil hose (19) to PTO (2).
(17) Connect electrical connectors P217 (20) and P216 (21)
to PTO (2).
f. Follow-On Maintenance.
(1) Install hydraulic rotary pump (para 16-5).
(2) Connect batteries (TM 9-2320-365-20-3).
(3) Operate 11K self-recovery winch (SRW) and check for
proper operation (TM 9-2320-365-10).
End of Task.
16-42
Change 1