TM 9-2320-365-102-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION(CONT)CAUTIONCable must be lowered to extend boom. Failure to comply may result in damageto equipment.(6) Place hoist control switch (4) in up position to pay out cable (5).(7) Remove quick release pin (6) from boom (1).(8) Set boom extension (7) to desired position.WARNINGDetermine required Light Material Handling Crane (LMHC) settings prior totelescoping boom. Failure to comply may result in injury to personnel ordamage to equipment.(9) Align holes in boom extension (7) and boom (1).(10) Install quick release pin (6) in boom (1).2-194
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business