TM 9-2320-365-10
2-24. LIGHT MATERIAL HANDLING CRANE (LMHC) OPERATION
(CONT)
j. Raise and Lower Load.
CAUTION
Do not lift load over maximum load rating for Light Material Handling Crane
(LMHC). Failure to comply may result in damage to equipment.
Use only a straight pull when lifting load. Failure to comply may result in damage
to equipment.
After performing eight cycles with LMHC, allow 30 minutes to cool down. A cycle
is defined as pickup, move, and place a load. A cycle may be from cargo bed of
vehicle to ground or ground to cargo bed of vehicle. Failure to comply may result
in damage to equipment.
NOTE
Steps (1) through (7) require the aid of an assistant.
(1) Adjust boom (1) until end of boom is over load (para 2-24g).
(2) Place hoist control switch (2) in up position to pay out cable (3).
(3) Connect hook (4) to load.
2-196