TM 9-2320-365-34-2
3-10. FLEXPLATE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine removed (para 3-3).
Engine fan and fan clutch removed (TM 9-2320-365-20-
3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Tools and Special Tools (Cont)
Wrench, Torque, 0-175 lb-ft (Item 80, Appendix
B)
Goggles, Industrial (Item 25, Appendix B)
Materials/Parts
Sealing Compound (Item 74, Appendix C)
a. Removal.
NOTE
Perform step (1) for engine with ring gear
and shims installed.
(1) Remove eight bolts (1), plate (2), three shims (3), and
gear and disc assembly (4) from hub adapter (5).
NOTE
Perform step (2) for engine with balance
plate and shims installed.
(2) Remove eight bolts (1), plate (2), three flexplates (3),
and flexplate assembly (4) from hub adapter (5).
3-84