TM 9-2320-365-34-2
7-6. TRANSMISSION RESILIENT MOUNT AND BRACKET REPLACEMENT (CONT)
(9) Remove two bolts (19) and resilient mount (20) from
bracket (18).
b. LH Installation.
(1) Position resilient mount (1) on bracket (2) with two
bolts (3).
(2) Tighten two bolts (3) to 76-94 lb-ft (103-127 N·m).
NOTE
Steps (3) through (8) require the aid of an
assistant.
(3) Position bracket (2) on frame rail (4) with bolt (5) and
self-locking nut (6).
(4) Position bolt (7) and self-locking nut (8) in frame rail
(4).
(5) Tighten self-locking nuts (6 and 8) to 210-225 lb-ft
(285-305 N·m).
7-48