TM 9-2320-365-34-27-6. TRANSMISSION RESILIENT MOUNT AND BRACKET REPLACEMENT (CONT)(9) Remove two bolts (19) and resilient mount (20) frombracket (18).b. LH Installation.(1) Position resilient mount (1) on bracket (2) with twobolts (3).(2) Tighten two bolts (3) to 76-94 lb-ft (103-127 N·m).NOTESteps (3) through (8) require the aid of anassistant.(3) Position bracket (2) on frame rail (4) with bolt (5) andself-locking nut (6).(4) Position bolt (7) and self-locking nut (8) in frame rail(4).(5) Tighten self-locking nuts (6 and 8) to 210-225 lb-ft(285-305 N·m).7-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business