TM 9-2320-365-34-2(7) Remove two bolts (16) and resilient mount (17) frombracket (15).d. RH Installation.(1) Position resilient mount (1) on bracket (2) with twobolts (3).(2) Tighten two bolts (3) to 76-94 lb-ft (103-127 N·m).NOTESteps (3) through (11) require the aid of anassistant.(3) Position bracket (3) on frame rail (4) with bolt (5) andself-locking nut (6).(4) Position bolt (7) in frame rail (4) with self-locking nut(8).(5) Tighten self-locking nuts (6 and 8) to 210-225 lb-ft(285-305 N·m).7-51
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business