TM 9-2320-365-34-2
NOTE
Perform steps (19) through (23) on LH side.
(19) Position screw (33) in frame rail (16) with lockwasher
(34) and self-locking nut (35).
(20) Tighten self-locking nut (35) to 84-108 lb-in. (10-12 N·m).
(21) Position clamp (36) and lug terminal TL93 (37) on screw
(33) with self-locking nut (38).
(22) Positions screw (39) and bracket (40) on frame rail (16)
with self-locking nut (41).
(23) Tighten self-locking nuts (38 and 41) to 84-108 lb-in. (10-
12 N·m).
c. M1081 Removal.
NOTE
Left and right side of shock mount
crossmember is removed the same way. Left
side shown.
(1) Remove self-locking nut (1), bolt (2), and washer (3)
from shock mount crossmember (4). Discard self-locking
nut.
(2) Remove self-locking nut (5), bolt (6), two washers (7),
and shock absorber (8) from lower bracket (9). Discard
self-locking nut.
13-23