TM 9-2320-365-34-23-16. OIL PAN REPLACEMENT (CONT)(10) Position bracket (6) toward engine.(11) Position screw (7) in each side of bracket (6).(12) Tighten screws (7 and 8) to 98-142 lb-ft (133-193 N·m).(13) Install oil cooler (9) on bracket (6) with clamp (10) andscrew (11).(14) Install three coolant hoses (12) on oil cooler (9) withthree clamps (13).(15) Connect two oil cooler tubes (14) to oil cooler (9).3-112
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business