TM 9-2320-365-34-2
13-17. INTERMEDIATE CROSSMEMBER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
One frame rail removed (para 13-13).
Tools and Special Tools
Tool Kit, Genl Mech (Item 68, Appendix B)
Wrench, Torque, 0-600 lb-ft (Item 85, Appendix B)
Wrench Set, Socket (Item 74, Appendix B)
Socket Set, Impact (Item 50, Appendix B)
Wrench, Impact, Electric (Item 77, Appendix B)
Tools and Special Tools (Cont)
Goggles, Industrial (Item 25, Appendix B)
Sling, Cargo (2) (Item 48, Appendix B)
Materials/Parts
Bolt (4) (Item 13, Appendix F)
Nut, Self-locking (4) (Item 134, Appendix F)
Personnel Required
(2)
a. Removal.
WARNING
Intermediate
crossmember
weighs
approximately 75 lbs (34 kgs).
Attach a
suitable lifting device prior to removal.
Failure to comply may result in damage to
equipment or injury to personnel.
CAUTION
When removing bolts, continuous removal of
collars is mandatory.
Failure to comply will
result in seizing of collar to bolt.
NOTE
Step (1) requires the aid of an assistant.
Both intermediate crossmembers are removed
the same way. Front intermediate crossmember
shown.
Remove four collars (1), bolts (2), and intermediate
crossmember (3) from frame rail (4). Discard collars and
bolts.
13-85
